A sample of work delivered for the Kingdom's energy and industrial leaders.
Completed
GICC replaced the air disconnect switches at the Al Hassa 230 kV substation, safely removing the existing obsolete switches and erecting new units. The works were carried out under rigorous high-voltage safety and Permit-To-Work controls.
Completed
GICC constructed the grand exterior façade of Shubaily Grand Mall, delivering architectural blockwork, cast-in-place concrete elements, and full-perimeter engineered scaffolding to ensure flawless aesthetic alignment.
Completed
GICC constructed a specialized burn pit for the Shedgum NGL gas well-head, including mass bulk excavation, embankment grading, laser trimming, soil compaction, and formwork-encased concrete retention walls.
Completed
GICC fabricated and erected an Aramco-standard heavy structural steel canopy at the Ras Tanura NGL facility. The scope included high-tolerance steel manufacturing, blast-cleaning, epoxy coating, and safety crane lifting.
| Project Title | Sector | Scope of Works | Location | Status |
|---|---|---|---|---|
| Replacement of Air Disconnect Switches | Energy | Replacement of air disconnect switches at 230 kV substation | Al Hassa | Completed |
| Construction of Shubaily Grand Mall Façade | Building | Façade construction, blockwork & concrete elements | Al Khobar | Completed |
| Construction of Burn Pit – Shedgum NGL | Oil & Gas | Burn pit construction, bulk excavation & slope compaction | Shedgum | Completed |
| Installation of Aramco-Type Canopy | Oil & Gas | Canopy fabrication & erection at Ras Tanura NGL Plant | Ras Tanura | Completed |
| Dammam 2nd Industrial City Water Expansion | Water | HDPE & Carbon Steel pipeline distribution network | Dammam | Completed |
| Heavy Equipment Mobilization for Jubail Petrochemical | Support Services | Crane & heavy fleet supply for turnaround maintenance | Jubail | Completed |